Documents

The master plan process is anticipated to be an 18-month effort. As project summaries are developed, they will be posted and made available for the public. Check back to this page in early summer 2017 for a summary of existing condition.

A draft of the master plan is anticipated to be available to the public in early 2018.  Click the two hyperlinks for a map featuring parks and trails in the Valley and Lake Tahoe area in Placer County.